For D.M.R.C. Delhi (Work done at Khyber Pass Depot – sys-2)
Alignment centre line marking on Soffit of property deck area at Khyber Pass Depot. Clearly visible painted in black colour continues line. Centerline of turnout and cross over marked clearly indicating the toe points, marking of chainage at 25m intervals on Soffit of property deck painted in Red colour.
DGPS point fixing, traversing, bench mark fixing for AMEL (Airport Metro Express Line) is 26 kms.
For Kalindee Rail Nirman (Engineers) Ltd. (sys-3)
Fixed control points along the proposed alignment, marking of the control point alignment at every 3.5 meters/ gauge frame location, marking the offset of centre line at every 7 metres in straight & curve, offset in every 3.5 metres, leveling by digital level & as built for tunnel rail line, fixing alignment at yard, casting concrete pillars, fixing control points, leveling with auto & digital level.
For Simplex Concrete (India) Ltd. – Dwarka Line
We are supplying survey teams for Delhi Metro Rail Corporation, conducting engineering survey for traversing by total station, bench mark fixing and stake outs for various construction job for over the ground metro railway line (Dwarka site) with survey equipment.
For Larsen & Tubro Limited (I.T. Park, Shastri Park)
Construction layout, boundary fixing, road layout, leveling, verticality, traversing by total station, bench mark fixing, stake outs for various construction jobs at I.T. Park site, Delhi.
For M/s Larsen & Tubro Limited (Mandi house)
Supply of survey team at Mandi House Station. We are conducting engineering survey for traversing by total station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for various construction job & tunnel survey. Area calculation, preparing drawing, report by using various software from March 2005 to 1st November 2006.
For M/s Larsen & Tubro Limited (Udyog Bhawan)
Suply of survey teams for Udyog Bhawan site. We are conducting engineering survey for Triangulations by total station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for various construction job. Area calculation, preparing drawing, report by using various software from 15th November 2006 to March 2007.
ITD CEM-Cementation JV
Supply of survey teams for Delhi Metro Rail Corporation on behalf of ITD Cem-Cementation JV, the contract includes the construction of approx 7.3 km underground railway with 3 stations. Of this, 5.3 km are twin-tube running tunnels and underground station building constructions. The remaining 2 km will be constructed in open cut. OMSE is responsible for comprises in the construction survey and the machine guidance as well as the optical 3D deformation of measurements in the NATM areas, in addition to the measuring technique equipment for the geotechnical.
Construction Setting Out
Indian Oil Corporation Limited (Panipat refinery & Mathura refinery)
- The setting out and the construction surveying are the core competencies of OMSE. Besides the highly specialized Construction Setting Out advance surveying, OMSE provides all surveying services for all types of construction works. Whether you are building a power station, a road or a residential complex or want to build a private single-family house – OMSE is your competent partner.
- Supply of survey teams for Indian Oil Corporation limited (Panipat Refinery & Mathura Refinery, we are conducting engineering survey for traversing by total station, bench mark fixing by Auto Level, lines and stakeouts for various construction jobs. Making drawing and erports from 1st November 2003 to May 2005.
For M/s Larsen & Tubro Limited
Supply of survey team for TNRSP-03 road project, Ramnathpuram, Tamilnadu, we are conducting engineering survey for traversing by total station, bench mark fixing taking profile, cross-section, stake-outs for various construction job for road. Area calculation, preparing drawing, reporting by using various software from January 2006 to June 2007.
RELIANCE Energy Limited
- Supply of survey team for 2X300 MW DCRTPP for Yamuna Nagar, Haryana with latest own total station. We are conducting engineering survey for traversing by total station, bench mark fixing, buildings layout & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, reporting using various software from March 2005 to 25th April 2008.
- Supply of survey team for 2X600 MW DCRTPP for Hissar, Haryana with latest own total station. We are conducting engineering survey for traversing by total station, bench mark fixing, buildings layout & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, reporting using various software from March 2007 to till date.
- Supply of survey team (two teams) for 2X600 MW for Raghunathpur, West Bengal with latest own total station. We are conducting engineering survey for traversing by total station, bench mark fixing, buildings layout & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, reporting using various software from March 2008 to till date.
- Supply of survey team for 2X600 MW for Rosa, U.P. with latest own total station. We are conducting engineering survey for traversing by total station, bench mark fixing, buildings layout & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, reporting using various software from May 2008 to till date.
Oil & Natural Gas Corporation
Supply of survey teams (two teams) for pipeline we are conducting engineering survey for traversing by total station, control point fixing by GPS, bench mark fixing, layout for pipelines, stakeouts survey. Area calculation, preparing drawing, reporting using various software from February 2006 to March 2007.
ITD Cementation India Limited
- Supply of Survey team with 1” Total Station for 2X300 MW DCRTPP at Yamuna Nagar, Haryana for piling job.
- Supply of Survey teams for Chandigarh at road job.
M/s Larsen & Tubro Limited
- Survey contract for Panipat refinery at naphtha cracker plant and MSQ, we are conducting engineering survey for traversing by total station control point, bench mark fixing, stakeouts for various construction job layout for road. Area calculation, preparing drawing, reporting using various software from November 2006 to till date.
- Supply of fourteen survey team for I.G.I. Airport, New Delhi with latest own total station. We are conducting engineering survey for traversing by total station, bench mark fixing taking profile, 3D topographic survey, cross section, stakeouts for various construction job calculation, preparing drawing, reporting using various software from January 2007 to till date.
SAKET STATION for DMRC – supply of two survey teams.
Simiju Corporation, New Delhi
Topographic Survey, Contour Survey at Bhiwadi, Rajasthan.
SMCC Construction India Limited, New Delhi
To locate all permanent structures/ features like buildings, roads, wells, tube wells, culverts, drains/ nallahs, etc. plotting all details on the drawings. Taking spot levels at an interval of 5m/ 10m both sides of grid with reverence to standard datum levels. Drawing of contours at suitable intervals, measuring of the plot boundaries, plotting diagonals and calculating the area of the project. Preparing drawings on AUTOCAD and submitting soft copy of the same. Measuring magnetic meridian at the station free from local attraction & marking it on the drawings for Neemrana project.
M/s Toyo Engineering Corporation
Survey contract for Panipat refinery at naphtha cracker plant and MSQ, we are conducting engineering survey for traversing by total station control point, bench mark fixing, stakeouts for various construction job layout for road. Area calculation, preparing drawing, reporting using various software from November 2006 to August 2008.
Senbo Engineering Limited
Details 3D Topographic survey, cross section, contour survey, traversing, bench mark fixing, pillar making, alignment marking, pile point marking and various construction setting out jobs for AMEL c4 project.
Supply of survey team for I.G.I. Airport, New Delhi, we are conducting engineering survey for traversing by total station, bench mark fixing by Auto level, lines and stakeouts for various construction jobs. Making drawing and reporting using various software from 1st April 2007 till date.
Topographic survey and GPS control point fixing for proposed IGI Airport and existing airport.
Traversing, GPS survey work, bench mark fixing, Topographic survey for IGI airport and leveling work. Six teams from March 2007 till date.
M/s Leighton Limited
We are conducting engineering survey for traversing by total station control point, bench mark fixing and stakeouts for various construction jobs layout for road. Area calculation, preparing drawings, reporting using software from June 2007 to June 2008.
M/s Gammon India Limited
Project: Civil and architectural work for Design and construction of sea water intake structure, intake submarine tunnel, approach jetty and seal well for outfall structure for 500 MW Prototype Fast Breeder Reactor (PFBR) at Kalapakkam (Baba atomic power project).
Tunnel survey with profiler, nadir, boom laser and all profile taking, alignment marking, monitoring control point, etc.
M/s Aluwalia Contractors Limited, New Delhi
Project: Construction of Talkatora Stadium, New Delhi for Commonwealth Games. We are conducting engineering survey for traversing by total station, bench mark fixing by Auto level, lines and stakeouts for various construction jobs. Making drawings and reports from February 2009 till date.
M/s Bholasingh Jaiprakash Limited, Delhi
Project:
- Construction of underpass and road works in Noida (U.P.), Client – Noida Authority
- Construction of tunnel and lining for Hydro project including road and structure work, Client – NHPC
We are conducting engineering survey for traversing by total station control point, bench mark fixing, layouts for various construction foundation and profile marking for tunnels. Area calculation, preparing drawings, reporting using software from January 2009 till date.